EN | MS

PRODUCT INDEX / FORMWORK SYSTEMS

Heavy-Duty Shoring Tower (Prop Shoring Frame)

SLAB PROPS & SHORING

shoring tower prop tower heavy duty shoring slab shoring tower frame shoring post shore menara sokongan rangka sokongan 重型顶撑框架 排架支撑 门式支撑架 prop frame tower
Heavy-Duty Shoring Tower (Prop Shoring Frame)
Request Quote Enterprise Tender Service

WHAT IT IS

Heavy-duty shoring tower (prop shoring frame) is a stacked steel frame system used where individual adjustable props are insufficient — under transfer plates, thick flat-slab pours, bridge decks, and multi-storey propping in Malaysian high-rise construction. Steel frames are stacked tier by tier and cross-braced to form a freestanding tower transferring loads to the ground or a lower structural slab. Safe working loads typically 200–500 kN per tower leg. Frame bays 0.6 m × 0.6 m to 1.5 m × 1.5 m; adjustable in height with screw-jack U-heads and base plates. PE-certified design and DOSH inspection mandatory for loads >200 kN. HS 7308409000 · import duty 15% · SST 5%.

UNIT OF MEASURE

SET (PRIMARY) UNIT M

Typical pack size: Frame bays 0.6 m × 0.6 m to 1.5 m × 1.5 m; heights typically 1.5–4.5 m adjustable per tier; stacked to project height; supplied as frame + cross brace + U-head + base plate set

GRADE & SPECIFICATION

High-strength steel tube or pressed steel frame. Complies with BS 5975:2019 (falsework) and CIS 23:2023. Safe working load (SWL) typically 200–500 kN per tower leg depending on frame type and extension. PE design required for heavy-load applications.

CLASSIFICATION

UNSPSC 30191801
CIDB CATEGORY Formwork/Falsework — Shoring Tower (regulated under CIS 23:2023; DOSH BOWEC 1986; BS 5975:2019)
UNSPSC codes are issued by the United Nations Global Marketplace (UNGM). CIDB categories are defined by Malaysia's Construction Industry Development Board. These codes are informational — use them to verify, not replace, procurement classification.

TARIFF & TAX — PDK 2025

HS CODE (AHTN) 7308409000
OFFICIAL DESCRIPTION Other
IMPORT DUTY (MFN) 15%
SST 5%
Sourced from PDK 2025 (Customs Duties Order 2025). The import duty shown is the MFN / general rate — preferential rates under FTAs (ATIGA, ACFTA, etc.) are typically lower or zero. SST per the PDK 2025 schedule (a value like 10%/0% means standard/exempt variants). Indicative only — confirm the applicable rate and tax treatment with your licensed customs/tax agent before relying on it. Spotted an error? hello@ttkbuildingmaterials.com

QUICK REFERENCE

PRIMARY UOM

set

TYPICAL PACK SIZE

Frame bays 0.6 m × 0.6 m to 1.5 m × 1.5 m; heights typically 1.5–4.5 m adjustable per tier; stacked to project height; supplied as frame + cross brace + U-head + base plate set

CATEGORY

Formwork Systems

UNSPSC

30191801

GET QUOTES

Request Quote Tender Service

SUPPLIERS WHO CARRY THIS

FORMWORK SYSTEMS SUPPLIERS →
Doka Malaysia Sdn Bhd

Kuala Lumpur

Request Quote
PERI (Malaysia) Sdn Bhd

Selangor

Request Quote
MEVA Formwork Systems Malaysia

Kuala Lumpur

Request Quote
Stonglas Form Sdn Bhd

Selangor

Request Quote
U Win Trading & Supply Sdn. Bhd.

Johor

Request Quote

MALAYSIAN MANUFACTURERS IN THIS CATEGORY

Factories in Malaysia that make Formwork Systems products.

AW Formwork Products · Selangor Crestform Scaffolding · Selangor Huatraco Scaffold · Selangor Jet Formwork IBS · Selangor MFE Formwork Technology · Selangor

See all Malaysian building-materials manufacturers →

COMMONLY USED TOGETHER

Materials typically specified alongside Heavy-Duty Shoring Tower (Prop Shoring Frame) on the same job.

COMPARE SIMILAR PRODUCTS

H20 Timber Beam (Formwork Beam) → Formwork Plywood Panel (Shuttering Plywood) → Table Form (Flying Form / Flying Table) → Climbing Form System (Self-Climbing Formwork) →

Send a Quote Request

By submitting, you agree to our Privacy Notice .